Submit a Product

Visit https://data.ntpep.org to submit a product for NTPEP evaluation.

2020 NTPEP Technical Committee Submission Cycles

2020 NTPEP Technical Committee Submission Cycles

Technical Committee

Submission Cycle

Open Date

Close Date

Asphalt Release Agents (ARA)

Rolling Submission Cycle

1/1/2020

12/31/2020

Concrete Admixtures (CADD)

Rolling Submission Cycle

1/1/2020

12/31/2020

Concrete Coatings Systems (CCS)

Rolling Submission Cycle

1/1/2020

12/31/2020

Concrete Curing Compounds (CCC)

Cycle 1

1/1/2020

2/7/2020


Cycle 2

8/5/2020

8/30/2020

Corrugated Metal Pipe (CMP)

For 2021 Audit

10/15/2020

11/30/2020

Detectable Warning Systems (DWS)

Rolling Submission Cycle

1/1/2020

12/31/2020

Elastomeric Bridge Bearing Pads (EBB)

Rolling Submission Cycle

1/1/2020

12/31/2020

Epoxy and Resin Based Adhesive Bonding Systems (EBB)

Rolling Submission Cycle

10/15/2020

11/30/2020

Erosion Control Products/Sediment Retention Devices (ECP/SRD)

Cycle 1

1/20/2020

3/13/2020


Cycle 2

3/23/2020

6/5/2020


Cycle 3

6/22/2020

8/21/2020


Cycle 4

9/21/2020

11/27/2020

Geosynthetic Reinforcement (REGEO)

For 2021 Audit

9/1/2020

11/13/2020

Geotextiles and Geosynthetics (GTX)

For 2021 Audit

9/1/2020

11/13/2020

Guardrail/Guiderail (GRL)

For 2021 Audit

10/15/2020

11/30/2020

High Friction and Thin Overlays (HFTO)

Cycle 1

5/4/2020

7/17/2020

Pavement Marking Materials (PMM)

Cycle 1

1/20/2020

4/24/2020

PCC Joint Sealants and HMA Crack Sealers (JS/CS0

Cycle 1

4/20/2020

7/24/2020

Portable Changeable Message Signs/Flashing Arrow Panels (PCMS/FAP)

Cycle 1

9/21/2020

11/6/2020

Portland & Blended Cement (PBC)​

Cycle 1

TBD

TBD


Cycle 2

TBD

TBD


Cycle 3

TBD

TBD


Cycle 4

TBD

TBD

Raised Pavement Markers/Snowplowable Raised Pavement Markers (RPM/SRPM)

Cycle 1

5/4/2020

8/7/2020

Rapid Set Concrete Patch Materials (RSCP)

Cycle 1

8/5/2020

9/11/2020

Reinforcing Steel and Wire (REBAR,WWR,WIRE,SSTL,SWS)

For 2021 Audit

10/15/2020

11/30/2020

Roll Up Signs (RUP)

Cycle 1

12/18/2019

2/14/2020

Sign Sheeting Materials (SSM)

Cycle 1

12/18/2019

2/14/2020

Spray Applied Pipe Liners (SAPL)

Rolling Submission Cycle

1/1/2020

12/31/2020

Structural Steel Coatings (SSC)

Rolling Submission Cycle

TBD

12/31/2020

Temporary Traffic Control Devices (TTCD)

Cycle 1

4/1/2020

6/19/2020

Thermoplastic Pipe (THP)

For 2021 Audit

10/15/2020

11/30/2020

Warm Mix Asphalt Technologies (WMA

Cycle 1

2/3/2020

2/28/2020


Cycle 2

6/1/2020

6/26/2020


Cycle 3

10/5/2020

10/30/2020