Submit a Product

Visit https://data.ntpep.org to submit a product for NTPEP evaluation.

Copy of 2021 Submission Cycles (002)

2021 NTPEP Technical Committee Submission Cycles

Technical Committee

Submission Cycle

Opening Date

Closing Date

Asphalt Release Agents (ARA)

Rolling Submission Cycle

1/1/2021

12/31/2021

Concrete Admixtures (CADD)

Rolling Submission Cycle

1/1/2021

12/31/2021

Concrete Coatings Systems (CCS)

Rolling Submission Cycle

1/1/2021

12/31/2021

Concrete Curing Compounds (CCC)

Cycle 1

1/1/2021

2/5/2021


Cycle 2

8/2/2021

8/30/2021

Corrugated Metal Pipe (CMP)

For 2022 Audit

9/1/2021

11/12/2021

Detectable Warning Systems (DWS)

Rolling Submission Cycle

1/1/2021

12/31/2021

Elastomeric Bridge Bearing Pads (EBB)

For 2022 Audit

9/1/2021

11/12/2021

Epoxy and Resin Based Adhesive Bonding Systems (ERB)

Rolling Submission Cycle

1/1/2021

12/31/2021

Erosion Control Products/Sediment Retention Devices (ECP/SRD)

Cycle 1

1/18/2021

3/12/2021


Cycle 2

3/22/2021

6/4/2021


Cycle 3

6/21/2021

8/20/2021


Cycle 4

9/20/2021

11/26/2021

Geosynthetic Reinforcement (REGEO)

For 2022 Audit

9/1/2021

11/12/2021

Geotextiles and Geosynthetics (GTX)

For 2022 Audit

9/1/2021

11/12/2021

Guardrail/Guiderail (GRL)

For 2022 Audit

9/1/2021

11/12/2021

High Friction and Thin Overlays (HFTO)

Cycle 1

4/5/2021

6/7/2021

Pavement Marking Materials (PMM)

Cycle 1

1/18/2021

4/23/2021

PCC Joint Sealants and HMA Crack Sealers (JS/CS)

Cycle 1

5/3/2021

7/2/2021

Portable Changeable Message Signs/Flashing Arrow Panels (PCMS/FAP)

Cycle 1

9/20/2021

11/5/2021

Portland & Blended Cement (PBC)

Cycle 1

3/8/2021

5/8/2021

Raised Pavement Markers/Snowplowable Raised Pavement Markers (RPM/SRPM

Cycle 1

4/1/2021

6/15/2021

Rapid Set Concrete Patch Materials (RSCP)

Cycle 1

5/5/2021

7/15/2021

Reinforcing Steel and Wire (REBAR,WWR,WIRE,SSTL,SWS)

For 2022 Audit

9/1/2021

11/12/2021

Roll Up Signs (RUP)

Cycle 1

12/21/2020

2/12/2021

Sign Sheeting Materials (SSM)

Cycle 1

12/21/2020

2/12/2021

Spray Applied Pipe Liners (SAPL)

Rolling Submission Cycle

1/1/2021

12/31/2021

Structural Steel Coatings (SSC)

Rolling Submission Cycle

1/1/2021

12/31/2021

Temporary Traffic Control Devices (TTCD)

Cycle 1

4/5/2021

6/18/2021

Thermoplastic Pipe (THP)

For 2022 Audit

9/1/2021

11/12/2021

Warm Mix Asphalt Technologies (WMA)

Cycle 1

2/1/2021

2/26/2021


Cycle 2

6/1/2021

6/30/2021


Cycle 3

10/1/2021

10/29/2021